TIC Projects - Brief:

The reconstruction of 12 of the existing 18 holes after the removal of 250,000m3 of sand. This included a complete irrigation upgrade, tee and bunker rebuilding and some re-modelling of existing greens on the rest of the course.

Project challenges:

  • Due to the need to excavate a large quantity of sand and to create lakes for the storage of irrigation water the golfing corridors were considerably reduced requiring careful planning of the new layout.
  • The exposed nature of the site required TIC to hydromulch complete fairways to stop the seed from being blown out to sea.